Project | Andhikhola Hydropower Project (Upgrading 5.1 to 9.4 MW) |
Location | Syangja District |
Owner | Butwal Power Company (BPC) Limited |
Scope of Work | Construction of civil works: Headworks structure which include weir, intake, stilling basin, box culvert, intake canal, settling basin, flushing structure, headrace tunnel outlet modification, surge tank modification, powerhouse, tailrace tunnel modification and tailrace tunnel outlet portal construction work, staff quarter and guest house building work |
Period of Construction | 9 month |