Excellence in Construction since 1978
An Iso 9001:2008 Certified Company

Andhikhola Hydropower Project (Upgrading 5.1 to 9.4 MW)

Andhikhola Hydropower Project (Upgrading 5.1 to 9.4 MW)

Project Andhikhola Hydropower Project (Upgrading 5.1 to 9.4 MW)
Location Syangja District
Owner Butwal Power Company (BPC) Limited
Scope of Work Construction of civil works: Headworks structure which include weir, intake, stilling basin, box culvert, intake canal, settling basin, flushing structure, headrace tunnel outlet modification, surge tank modification, powerhouse, tailrace tunnel modification and tailrace tunnel outlet portal construction work, staff quarter and guest house building work
Period of Construction 9 month