Specialized Construction

Himal Hydro is accustomed to difficult site conditions. We have adapted equipment and process to solve difficult logistics problems thereby enabling the timely completion of projects in remote and high altitude sites.

By

Georgiy Traksel

ROLE

Architecture

Published

March 25th 2020

Visit Site

Our Services

WHAT We DO

01

Media Planing

Himal Hydro undertook the construction of a lined channel with a gate structure for controlled discharge of water in order to lower the water level of the glacier lake. The site is reachable only after 7 days of trek.

02

Media Planing

Due to problems of landslide mass in the route of tunnel, some form of additional ground treatment system also known as Pipe canopy or Umbrella Method was required for the progress of tunnel. This method was used for first time in Nepal and it was very successful and completed ahead of schedule.

Specialized Construction

that We have

Civil Construction works for two and half storied frame structures school building of plinth area of Khimti I Hydropower Plant, Dolakha

(March 2005 - October 2005)

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolre magna aliqua.

Radiology Remodel Works Project

(July 2004 - October 2004)

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolre magna aliqua.

Turnkey design and construction of Nursery Addition and Maternity Ward Remodel, Surgical Office Addition and Exit Ramp Construction Project of Patan Hospital

(4 September 2003 - July 2004)

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolre magna aliqua.

Civil works of Hydro Lab Office Building Project Name of Employer: Hydro Lab Pvt. Ltd.

(19 December 2002 - 31 December 2004)

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolre magna aliqua.

Construction works of the Nepal Engineers’ Association Building at Pulchowk

(25 October 2000 - 23 August 2001)

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolre magna aliqua.

Awesome Portfolio

Looking for quality features

Help Millions To Bring
There Creative Projects To Life

We were thoughtful about presenting these in a way where we could also tell the story of the individual.. It is a long established fact that a reader will be distracted by the readable content of a page when looking at its layout. The point of using Lorem Ipsum is that it has a more-or-less normal distribution of letters.

Our News

Lasts post

We proud of our digital kids

OUR AWARDS

120
Finished projects
377
Happy customers
27
Awards won
0%